HWY BARK HAUL RD over I 91

MM 0.8 ON I-91 · County 013, Massachusetts · Built 2002 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
L140028DUDOTNBI
Year Built
2002
Length
53.3 m (174.9 ft)
Max Span
26 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
150
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,599,000
Total Project Cost
$2,399,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.