HWY POND ST over WATER MONOOSNOC BROOK

200 FT EAST OF ELM STREET · County 027, Massachusetts · Built 1900 · 2 Lanes · 9,700 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
L080091CEMUNNBI
Year Built
1900
Reconstructed
1936
Length
22.9 m (75.1 ft)
Max Span
13.4 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
9,700
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$5,402,000
Total Project Cost
$8,104,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.