HWY CLM ST TO ML over RR HRR

0.4 MI N OF US20 76.34 · County 003, Massachusetts · Built 1943 · 2 Lanes · 129 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L050400DLDOT634
Year Built
1943
Reconstructed
1987
Length
13.7 m (44.9 ft)
Max Span
11.9 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
129
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$938,000
Total Project Cost
$1,408,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.