HWY TYRINGHAM RD over WATER GOOSE POND BROOK

JUST S OF RTE 102 · County 003, Massachusetts · Built 1938 · 2 Lanes · 1,429 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
L05006016MUNNBI
Year Built
1938
Reconstructed
1995
Length
18.4 m (60.4 ft)
Max Span
8.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
1,429
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,629,000
Total Project Cost
$2,444,000