I 495 NB over ST135 WOOD ST

MM 55.3 · County 017, Massachusetts · Built 1966 · 3 Lanes · 48,152 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
H230101UTDOTNBI
Year Built
1966
Length
18.6 m (61 ft)
Max Span
17.4 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
48,152
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,085,000
Total Project Cost
$3,128,000