HWY SADOGA RD over WATER BURRINGTON BROOK

600 W. OF INT. W/ RT 8A · County 011, Massachusetts · Built 2017 · 2 Lanes · 129 vehicles/day

Overall
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
H14009BT6MUNNBI
Year Built
2017
Length
10.4 m (34.1 ft)
Max Span
10.3 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
129
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.