HWY HARDWICK RD over WATER WARE RIVER

NEW BRAINTREE T. L. · County 027, Massachusetts · Built 1978 · 2 Lanes · 2,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H080016LFMUNNBI
Year Built
1978
Length
38.3 m (125.7 ft)
Max Span
36.4 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
2,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,067,000
Total Project Cost
$3,101,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.