HWY MERIDIAN ST over WATER GREEN RIVER

AT JCT OF DFLD ST · County 011, Massachusetts · Built 1917 · 2 Lanes · 1,121 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
G120130Q9MUNNBI
Year Built
1917
Length
27.4 m (89.9 ft)
Max Span
27.4 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
1,121
Material
Concrete
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,036,000
Total Project Cost
$3,055,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.