HWY LIBERTY ST over WATER LOWER MILL POND

450 W OF ADAMS ST · County 015, Massachusetts · Built 1956 · 2 Lanes · 1,650 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
E050020LCMUNNBI
Year Built
1956
Length
12.6 m (41.3 ft)
Max Span
12.2 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
1,650
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,641,000
Total Project Cost
$3,962,000