HWY PHINEAS ST over WATER BEAVER BROOK

3.4 MI N OF RT 3 · County 017, Massachusetts · Built 1995 · 2 Lanes · 6,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
D110052CXMUNNBI
Year Built
1995
Length
42.3 m (138.8 ft)
Max Span
40.8 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
6,100
Material
Steel
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,814,000
Total Project Cost
$4,222,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.