HWY DOVER RD over WATER CHARLES RIVER

.6 KM E OF NATICK LINE · County 021, Massachusetts · Built 2002 · 2 Lanes · 11,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
D10002AFAMUNNBI
Year Built
2002
Length
38.6 m (126.6 ft)
Max Span
13 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
11,300
Material
Prestressed Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,978,000
Total Project Cost
$4,468,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.