ST 9 BERKSHIRE TR over WATER WESTFIELD RIVER
200 E JCT STAGE RD. · County 015, Massachusetts · Built 1958 · 2 Lanes · 2,720 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.482353, -72.932564
This bridge is in worse condition than 59.7% of bridges in County 015. The average bridge in Massachusetts is 0 years old; this one is 68 years old.
Nearby Bridges
ST 9 BERKSHIRE TR over WATER BARTLET BROOK
Built 1958
HWY STAGE RD over WATER MILL BROOK
Built 1988
HWY S UNION ST over WATER MILL BROOK
Built 1940
ST 9 BERKSHIRE TR over WATER WESTFIELD RIVER
Built 1958
HWY RIVER RD over WATER MILL RIVER
Built 1940
HWY STAGE RD over WATER MEADOW BROOK
Built 1938
HWY W MAIN ST over WATER WESTFIELD RIVER
Built 1922
ST 9 BERKSHIRE TR over WATER WESTFIELD BROOK
Built 1958
HWY PLAINFLD RD over WATER WESTFIELD RIVER
Built 1939
HWY NASH RD over WATER MEADOW BROOK
Built 1940
Bridge Details
- Structure #
- C210250JKDOTNBI
- Year Built
- 1958
- Length
- 70.1 m (230 ft)
- Max Span
- 33.8 m
- Width
- 15.3 m (50.2 ft)
- Lanes
- 2
- Daily Traffic
- 2,720
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,053,000
- Total Project Cost
- $10,580,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.