HWY SHELBRN FLS over WATER BEAR RIVER

.4 MI S. OF THOMPSON RD · County 011, Massachusetts · Built 1992 · 2 Lanes · 950 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
C200180F4MUNNBI
Year Built
1992
Length
31.4 m (103 ft)
Max Span
29.9 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
950
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,197,000
Total Project Cost
$1,796,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.