HWY HEATH RD over WATER TAYLOR BROOK

1 MILE W OF MAXAM RD · County 011, Massachusetts · Built 1939 · 2 Lanes · 517 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
C180370GGMUNNBI
Year Built
1939
Length
8.5 m (27.9 ft)
Max Span
7.6 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
517
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$427,000
Total Project Cost
$641,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.