I 391 over ST116 CENTER ST

MM 1.0 ON I-391 · County 013, Massachusetts · Built 1981 · 6 Lanes · 38,017 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
C130400WKDOTNBI
Year Built
1981
Length
62.5 m (205.1 ft)
Max Span
30.9 m
Width
34.5 m (113.2 ft)
Lanes
6
Daily Traffic
38,017
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,600,000
Total Project Cost
$30,901,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.