HWY SMITH RD over WATER M BR WESTFIELD RIV

AT JCT. W/ E. RIVER ROAD · County 013, Massachusetts · Built 2009 · 2 Lanes · 129 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
C11051AEMMUNNBI
Year Built
2009
Length
26.4 m (86.6 ft)
Max Span
25.9 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
129
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$3,737,000
Total Project Cost
$5,606,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.