US 20 HUNTINGTN RD over WATER GOLD MINE BROOK

0.9 MI W OF HUNTINGTON TL · County 013, Massachusetts · Built 1930 · 2 Lanes · 2,716 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
C110360ARDOTNBI
Year Built
1930
Length
8.8 m (28.9 ft)
Max Span
7.9 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
2,716
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$169,000
Total Project Cost
$254,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.