ST129 BILLERICA RD over US 3
RT 129 AT RT 3 · County 017, Massachusetts · Built 2004 · 4 Lanes · 25,000 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.588981, -71.312972
This bridge is in worse condition than 25.6% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 22 years old.
Nearby Bridges
HWY LWLL CONN SB over US 3
Built 2004
HWY RANGEWAY RD over US 3
Built 2004
HWY LWLL CONN NB over HWY RIVERNECK RD
Built 1959
HWY LWLL CONN SB over HWY RIVERNECK RD
Built 1959
HWY LWLL CONN NB over I 495 RAMP B-11
Built 1959
HWY LWLL CONN SB over I 495 RAMP B-11
Built 1959
HWY RIVERNECK RD over US 3
Built 2004
HWY POLLARD ST over WATER CONCORD RIVER
Built 1998
HWY NB LOWLL CON over I 495
Built 1959
HWY LWL CON B-11 over I 495
Built 1959
Bridge Details
- Structure #
- C08024AY7DOTNBI
- Year Built
- 2004
- Length
- 87 m (285.4 ft)
- Max Span
- 42.5 m
- Width
- 22.7 m (74.5 ft)
- Lanes
- 4
- Daily Traffic
- 25,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,606,000
- Total Project Cost
- $3,910,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.