HWY NORTHSIDE RD over I 90
0.3 MI. S. OF STAFFORD ST · County 027, Massachusetts · Built 1957 · 2 Lanes · 1,034 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.160064, -71.954581
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
HWY CENTER DEPOT over I 90
Built 1957
HWY HAMMOND HILL over I 90
Built 1957
HWY JONES RD over RR CSX
Built 2012
HWY HAMMOND HILL over WATER LITTLE RIVER
Built 1956
HWY GOULD RD over RR CSX
Built 1978
HWY STAFFORD ST over I 90
Built 1957
HWY STAFFORD ST over RR CSX
Built 1914
ST 31 NEW SPNCR RD over RR CSX
Built 1954
I 90 WB over ST 31 CITY DEPOT RD
Built 1957
I 90 EB over ST 31 CITY DEPOT RD
Built 1957
Bridge Details
- Structure #
- C060404L2DOTNBI
- Year Built
- 1957
- Length
- 80.2 m (263.1 ft)
- Max Span
- 24.9 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,034
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,944,000
- Total Project Cost
- $7,417,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.