ST 3 NB/MEMORL DR over ST 3 SB TO LONGFLLW BRG

.1 MI S OF LONGFELLOW BR · County 017, Massachusetts · Built 1957 · 2 Lanes · 28,450 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
C010454DKDOTNBI
Year Built
1957
Length
20.7 m (67.9 ft)
Max Span
17.7 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
28,450
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,855,000
Total Project Cost
$2,783,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.