HWY CEMETERY RD over WATER CLESSON BROOK

100 S. JCT W/CLSSN BR RD · County 011, Massachusetts · Built 1939 · 1 Lanes · 129 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B280150FVMUNNBI
Year Built
1939
Reconstructed
1998
Length
10.4 m (34.1 ft)
Max Span
9.9 m
Width
4.6 m (15.1 ft)
Lanes
1
Daily Traffic
129
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,855,000
Total Project Cost
$2,783,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.