ST 9 over WATER SWIFT RIVER

.3 M W JCT RIVER RD · County 015, Massachusetts · Built 2007 · 2 Lanes · 6,315 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B0502790DDOTNBI
Year Built
2007
Length
32.2 m (105.6 ft)
Max Span
31 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
6,315
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$463,000
Total Project Cost
$695,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.