HWY QUARRY RD over WATER CUSHMAN BROOK

.25MI. S. OF INT.W/RTE 20 · County 003, Massachusetts · Built 1939 · 2 Lanes · 120 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
B0304503AMUNNBI
Year Built
1939
Length
8.7 m (28.5 ft)
Max Span
7.2 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
120
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,690,000
Total Project Cost
$2,536,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.