MD 200 (ICC) EB over Ramp NW

0.6 mi W of Briggs Chaney · County 031, Maryland · Built 2011 · 3 Lanes · 22,682 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
300000M-V161013
Year Built
2011
Length
28.5 m (93.5 ft)
Max Span
26.8 m
Width
18.6 m (61 ft)
Lanes
3
Daily Traffic
22,682
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.