I-895 B NB over MD 170

I-895NB Milepost B1.9 · County 003, Maryland · Built 1957 · 2 Lanes · 14,912 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
300000AAY056011
Year Built
1957
Reconstructed
1982
Length
61.9 m (203.1 ft)
Max Span
30.2 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
14,912
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.