RESEARCH ROAD over BEAVER DAM CREEK

CAPITAL BELTWAY TO EXIT 2 · County 033, Maryland · Built 1966 · 2 Lanes · 600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
2001002P0000000
Year Built
1966
Length
19.2 m (63 ft)
Max Span
18.3 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$560,000
Total Project Cost
$840,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.