STEWART NECK ROAD over TAYLOR BRANCH
0.7 MI S OF PRINCESS ANNE · County 039, Maryland · Built 1978 · 2 Lanes · 770 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
38, -75
This bridge is in worse condition than 65.2% of bridges in County 039. The average bridge in Maryland is 0 years old; this one is 48 years old.
Nearby Bridges
Bridge Details
- Structure #
- 200000S-0001010
- Year Built
- 1978
- Reconstructed
- 1990
- Length
- 19.2 m (63 ft)
- Max Span
- 4.6 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 770
- Material
- Wood or Timber
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $15,000
- Total Project Cost
- $17,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.