NATIONAL BUSINESS over TRIBUTARY TO DORSEY RUN

.68 M N OF TECHNOLOGY DR · County 003, Maryland · Built 2011 · 4 Lanes · 13,301 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
200000AA4021010
Year Built
2011
Length
18.2 m (59.7 ft)
Max Span
16.5 m
Width
18.2 m (59.7 ft)
Lanes
4
Daily Traffic
13,301
Material
Concrete
Design
Arch - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.