TURKEY POINT ROAD over SELBY BAY

0.40 MI E OF MD 214 · County 003, Maryland · Built 1994 · 2 Lanes · 1,123 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
200000AA1011010
Year Built
1994
Length
15.9 m (52.2 ft)
Max Span
14.6 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
1,123
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.