US 13 NB over MEADOW BRIDGE ROAD

0.52 MILE SOUTH OF MD 513 · County 045, Maryland · Built 1981 · 2 Lanes · 17,160 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
100000220042011
Year Built
1981
Length
35.7 m (117.1 ft)
Max Span
34.4 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
17,160
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$303,000
Total Project Cost
$333,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.