IS 595 RAMP A(5) over IS 95 IS 595 RAMP D&E

0.1 MI W OF IS 595 US 50 · County 033, Maryland · Built 1992 · 2 Lanes · 20,543 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100000160223010
Year Built
1992
Length
674.2 m (2211.9 ft)
Max Span
57 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
20,543
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,034,000
Total Project Cost
$7,737,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.