MD 4 EBR over PATUXENT RIVER

ON ANNE ARUNDEL CO LINE · County 033, Maryland · Built 1959 · 2 Lanes · 57,061 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 7 Good

Location

38.810969, -76.711928

This bridge is in worse condition than 37.7% of bridges in County 033. The average bridge in Maryland is 0 years old; this one is 67 years old.

Nearby Bridges

Bridge Details

Structure #
100000160095010
Year Built
1959
Reconstructed
1996
Length
75.3 m (247 ft)
Max Span
24.7 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
57,061
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$536,000
Total Project Cost
$590,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.