MD 193 (UNIVERSITY over NW BRANCH
0.8 MI. EAST OF MD 212 · County 033, Maryland · Built 2024 · 2 Lanes · 38,675 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
This bridge is in worse condition than 34.4% of bridges in County 033. The average bridge in Maryland is 0 years old; this one is 2 years old.
Bridge Details
- Structure #
- 100000160018013
- Year Built
- 2024
- Length
- 40.1 m (131.6 ft)
- Max Span
- 26.2 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 38,675
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.