MARRIOTTSVILLE RD over IS 70
0.91 MI E OF US 40 · County 027, Maryland · Built 1968 · 2 Lanes · 18,047 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.304108, -76.899175
This bridge is in worse condition than 79.2% of bridges in County 027. The average bridge in Maryland is 0 years old; this one is 58 years old.
Nearby Bridges
IS 70 EB over TRANS CONT PIPE LINE
Built 1968
IS 70 WB over TRANS CONT PIPE LINE
Built 1968
MARRIOTTSVILLE ROA over LITTLE PATUXENT RIVER
Built 1967
RESORT ROAD over UNNAMED INTERMITTENT STR
Built 2019
US 40 WB over IS 70
Built 1968
TOWN SQUARE PARKWA over LITTLE PATUXENT RIVER
Built 2015
RESORT ROAD over UNNAMED PERENNIAL STREAM
Built 2019
TURF VALLEY ROAD over LITTLE PATUXENT RIVER
Built 1980
RED DAHLIA DRIVE over DAVIS BRANCH
Built 1995
MD 99 over DAVIS BRANCH
Built 1986
Bridge Details
- Structure #
- 100000130053010
- Year Built
- 1968
- Reconstructed
- 1974
- Length
- 76.2 m (250 ft)
- Max Span
- 37.2 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 18,047
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $585,000
- Total Project Cost
- $644,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.