MD 132B over SWAN CREEK

0.33 MILE SOUTH OF US 40 · County 025, Maryland · Built 1930 · 2 Lanes · 4,030 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
100000120013010
Year Built
1930
Length
12.2 m (40 ft)
Max Span
11 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
4,030
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$58,000
Total Project Cost
$64,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.