MD 228 over PINEY BRANCH

1.18 M E OF PG CO LINE · County 017, Maryland · Built 1957 · 5 Lanes · 39,800 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
100000080030020
Year Built
1957
Reconstructed
1995
Length
11.9 m (39 ft)
Max Span
5.5 m
Lanes
5
Daily Traffic
39,800
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$94,000
Total Project Cost
$103,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.