MD 5 SB over ZEKIAH SWAMP

0.54 MILE SOUTH OF MD 488 · County 017, Maryland · Built 1931 · 2 Lanes · 41,209 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
100000080003012
Year Built
1931
Reconstructed
1938
Length
10.7 m (35.1 ft)
Max Span
9.8 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
41,209
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$75,000
Total Project Cost
$85,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.