MD 129 over NORTH BRANCH

1.81 MI N OF MD 130 · County 005, Maryland · Built 1900 · 2 Lanes · 900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
100000030072010
Year Built
1900
Reconstructed
1945
Length
10.7 m (35.1 ft)
Max Span
4.6 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
900
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$131,000
Total Project Cost
$144,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.