FLETCHER DRIVE over IS 68

FLETCHER DR · County 001, Maryland · Built 1968 · 2 Lanes · 944 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
100000010104010
Year Built
1968
Reconstructed
1986
Length
87.8 m (288.1 ft)
Max Span
36 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
944
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,458,000
Total Project Cost
$1,604,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.