US 220 over TRIB TO NORTH BR POTOMAC

1.21 M N OF MD 830A · County 001, Maryland · Built 1900 · 2 Lanes · 7,111 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
100000010062010
Year Built
1900
Reconstructed
1955
Length
7 m (23 ft)
Max Span
6.4 m
Width
18.6 m (61 ft)
Lanes
2
Daily Traffic
7,111
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$77,000
Total Project Cost
$85,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.