I 295 SB over US1 Forest Ave

Exit 6 · County 005, Maine · Built 1973 · 3 Lanes · 37,920 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
6539
Year Built
1973
Length
39.8 m (130.6 ft)
Max Span
38.1 m
Width
15.5 m (50.9 ft)
Lanes
3
Daily Traffic
37,920
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.