ALFOND CONNECTOR over Kennebec River

.2 Mi.W RTE 201/100 · County 011, Maine · Built 2005 · 4 Lanes · 14,820 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
6400
Year Built
2005
Length
337.8 m (1108.3 ft)
Max Span
73 m
Width
20.2 m (66.3 ft)
Lanes
4
Daily Traffic
14,820
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.