I 295 NB over RT 125 & 138 (MAIN ST)

INTERCHANGE 37 · County 023, Maine · Built 1976 · 2 Lanes · 12,060 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
6311
Year Built
1976
Reconstructed
2007
Length
28.2 m (92.5 ft)
Max Span
26.5 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
12,060
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.