DYER BROOK RD over I-95 SOUTHBOUND

OVER I95 MILE 284.2 · County 003, Maine · Built 1966 · 2 Lanes · 560 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
6129
Year Built
1966
Length
66.5 m (218.2 ft)
Max Span
24.4 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
560
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.