MOLUNKUS RD over W BR WESSERUNSETT STR

3.3 MI S JCT #43 · County 025, Maine · Built 2022 · 2 Lanes · 294 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
6054
Year Built
2022
Length
21.3 m (69.9 ft)
Max Span
21 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
294
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.