I 295 NB over VERANDA ST & US 1

I-295 OVER US1 · County 005, Maine · Built 2022 · 4 Lanes · 27,010 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
5933
Year Built
2022
Length
24.4 m (80.1 ft)
Max Span
21.6 m
Width
28.8 m (94.5 ft)
Lanes
4
Daily Traffic
27,010
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.