ST RTE 103 over TIDAL ESTUARY

0.9 MI S JCT US 1A · County 031, Maine · Built 2011 · 2 Lanes · 2,051 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
5849
Year Built
2011
Length
15.9 m (52.2 ft)
Max Span
15.2 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,051
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.