ISLAND RD over ATLANTIC OCEAN

MAINLAND-SPRUCE HEAD IS. · County 013, Maine · Built 2010 · 2 Lanes · 900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
5578
Year Built
2010
Length
31.4 m (103 ft)
Max Span
30.5 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
900
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.