KING ST over THOMPSON LAKE OUTLET

0.1 MI S OF JCT RTE 121 · County 017, Maine · Built 1954 · 2 Lanes · 2,051 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
5552
Year Built
1954
Length
10.5 m (34.4 ft)
Max Span
9.1 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
2,051
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.