LONG RD over LIMESTONE STREAM

0.5 MI ELY OF ROUTE 1A · County 003, Maine · Built 1949 · 2 Lanes · 156 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
5186
Year Built
1949
Length
8.7 m (28.5 ft)
Max Span
7.6 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
156
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.